Edinbox
CBSE Rejects Evaluation Delay Claims, Class 12 Results on Track for May Release

CBSE Rejects Evaluation Delay Claims, Class 12 Results on Track for May Release

CBSE Rejects Evaluation Delay Claims, Class 12 Results on Track for May Release

The Central Board of Secondary Education has dismissed reports suggesting delays in the Class 12 evaluation process, asserting that results remain on schedule for release in May.

CBSE Controller of Examinations Sanyam Bhardwaj refuted claims of technical glitches in the newly implemented On-Screen Marking (OSM) system, calling such reports “far away from facts.” He emphasised that the evaluation process is progressing smoothly and, in fact, more efficiently than in previous years.

“My evaluation is going very perfectly, better than the previous evaluation,” Bhardwaj said, expressing confidence in the full-scale rollout of the digital marking system. The OSM system allows examiners to assess scanned answer sheets online, marking a shift from traditional paper-based evaluation and aiming to reduce inconsistencies and logistical delays.

Addressing concerns raised in sections of the media, Bhardwaj said all reports of disruptions were false. He added that feedback from evaluators has been overwhelmingly positive, with many appreciating the ease and efficiency of the digital platform. According to him, some teachers not currently involved in evaluation have also shown interest in participating in the process.

The board had earlier introduced the OSM system to streamline evaluation, ensure uniformity in marking, and speed up result processing. By eliminating the need for physical movement of answer scripts, the system is expected to enhance both accuracy and turnaround time.

Reassuring students and parents, Bhardwaj stated that the evaluation is proceeding “as per schedule.” He reiterated that Class 12 results are likely to be declared in the third week of May, in line with the board’s usual timeline.

Students have been advised to rely on official updates and avoid speculation regarding delays, as the board continues to maintain that the process is on track.

 

Edinbox Team

Add comment