CBSE Rejects Evaluation Delay Claims, Class 12 Results on Track for May Release

Insights
Typography
  • Smaller Small Medium Big Bigger
  • Default Helvetica Segoe Georgia Times

The Central Board of Secondary Education has dismissed reports suggesting delays in the Class 12 evaluation process, asserting that results remain on schedule for release in May.

CBSE Controller of Examinations Sanyam Bhardwaj refuted claims of technical glitches in the newly implemented On-Screen Marking (OSM) system, calling such reports “far away from facts.” He emphasised that the evaluation process is progressing smoothly and, in fact, more efficiently than in previous years.

“My evaluation is going very perfectly, better than the previous evaluation,” Bhardwaj said, expressing confidence in the full-scale rollout of the digital marking system. The OSM system allows examiners to assess scanned answer sheets online, marking a shift from traditional paper-based evaluation and aiming to reduce inconsistencies and logistical delays.

Addressing concerns raised in sections of the media, Bhardwaj said all reports of disruptions were false. He added that feedback from evaluators has been overwhelmingly positive, with many appreciating the ease and efficiency of the digital platform. According to him, some teachers not currently involved in evaluation have also shown interest in participating in the process.

The board had earlier introduced the OSM system to streamline evaluation, ensure uniformity in marking, and speed up result processing. By eliminating the need for physical movement of answer scripts, the system is expected to enhance both accuracy and turnaround time.

Reassuring students and parents, Bhardwaj stated that the evaluation is proceeding “as per schedule.” He reiterated that Class 12 results are likely to be declared in the third week of May, in line with the board’s usual timeline.

Students have been advised to rely on official updates and avoid speculation regarding delays, as the board continues to maintain that the process is on track.

 

EdInbox is a leading platform specializing in comprehensive entrance exam management services, guiding students toward academic success. Catering to a diverse audience, EdInbox covers a wide spectrum of topics ranging from educational policy updates to innovations in teaching methodologies. Whether you're a student, educator, or education enthusiast, EdInbox offers curated content that keeps you informed and engaged.

With a user-friendly interface and a commitment to delivering accurate and relevant information, EdInbox ensures that its readers stay ahead in the dynamic field of education. Whether it's the latest trends in digital learning or expert analyses on global educational developments, EdInbox serves as a reliable resource for anyone passionate about staying informed in the realm of education. For education news seekers, EdInbox is your go-to platform for staying connected and informed in today's fast-paced educational landscape.